Finished objects
Building of construction for production of shingles in UAB "Swedspan Girių Bizonas" (Closed Joint Stock Company "Swedspan bison of forests")
During the three-month period construction and mounting works of the building for production of shingle shaves were carried out. The customer is UAB "Swedspan Girių Bizonas" which is owned by SWEDSPAN group. The mounted line for the production of shaves in the building is the largest in East and North region of Europe, as well as it is one of the largest in the world. The concrete pouring works were carried out in difficult conditions - in winter, when high groundwater was present. Other works included all the general building works – construct, finish, communication and well-being. The total area of industrial building is 281 sqare metres, the capacity - 1891 cubic metres.
|