Construction and design works have been financed by the EU Cohesion fund and from the LR budget. Firstly the detail design project has been prepared according to the technical project. Construction of sewerage water networks have been performed in Šlienava, Kaunas district. During construction work 3,816 m of PVC sewerage water pipes DN200; 536 m of PE sewer pressure pipes DN100 have been installed with installation depth from 1,50 m to 6,10 m. Also house connections DN160 have been installed. Part of gravity sewer networks have been installed by trenchless method. Within the project 3 local pumping stations have been constructed, each capacity is 10,4 m3/h.